Grind Complete
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 1.3L Eng,O.H.C.- SOHC, w/Air Cond | 6.8 | A | ||
| 1.3L Eng,O.H.C.- SOHC, w/o Air Cond | 6.4 | A |