LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2007 >> XL7 Base, FWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Repair Instructions >> Battery Box Replacement >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

Fig 1: Battery Box And Mounting Bolts
G04843520Courtesy of SUZUKI OF AMERICA CORP.
  1. Position the battery box on the battery tray.
    CAUTION: Refer to FASTENER NOTICE .
  2. Install the battery box mounting bolts.

    Tightening torque 

    Tighten the bolts to 20 N.m (15 lb ft). 

    Fig 2: Battery Vent Tube And Battery Box
    G04843521Courtesy of SUZUKI OF AMERICA CORP.
  3. Install the battery vent tube from the battery box.
  4. Install the battery. Refer to INSTALLATION PROCEDURE .
    Fig 3: Locking Clips, Battery Vent Tube And Upper Radiator Air Deflector
    G04843522Courtesy of SUZUKI OF AMERICA CORP.
  5. Lock clips (2) from the battery vent tube (1).
  6. Install the battery vent tube (1) to the upper radiator air deflector (3).