LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2012 >> Equator Base >> Repair and Diagnosis >> Electrical >> Charging Systems >> Repair Instructions >> Battery: Removal and Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Battery: Removal and Installation: Installation

Installation is in the reverse order of removal.

CAUTION: Connect positive battery terminal first.

Battery clamp nuts: 3.92 N.m (0.40 kg-m, 35 in-lb) 

Battery terminal nut: 3.4 N.m (0.35 kg-m, 30 in-lb) 

Reset electronic systems as necessary. Refer to [Additional Service When Removing Battery Negative Terminal ].