LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2013 >> Kizashi Base, Standard Trans >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Electrical Devices >> Repair Instructions >> ECM Removal and Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

ECM Removal and Installation: Installation

  1. Install ECM (1) to bracket (2).
  2. Tighten ECM mounting nuts (3) to specified torque.

    Tightening torque 

    ECM mounting nut (a): 5.5 N.m (0.56 kg-m, 4.0 lbf-ft) 

    Fig 1: Identifying ECM, Bracket And Mounting Nuts
    G06528116Courtesy of SUZUKI OF AMERICA CORP.
  3. Install ECM and bracket (1) to front fender bracket and battery tray aligning its locating pin (2) of front fender bracket with fitting hole (3).
    Fig 2: Identifying Front Fender Bracket With Fitting Hole
    G06528117Courtesy of SUZUKI OF AMERICA CORP.
  4. Connect connectors to ECM as follows.
    1. Make sure that lock lever of ECM connector is in unlock position.
      Fig 3: Identifying ECM Connector
      G06528118Courtesy of SUZUKI OF AMERICA CORP.
    2. Insert ECM connectors to ECM until it stops.
      Fig 4: Inserting ECM Connectors
      G06528119Courtesy of SUZUKI OF AMERICA CORP.
    3. Lock ECM connectors securely by setting their lock levers in their locked position.
      Fig 5: Identifying ECM Connectors Lock Position
      G06528120Courtesy of SUZUKI OF AMERICA CORP.
  5. Perform electric throttle control system calibration. see ELECTRIC THROTTLE CONTROL SYSTEM CALIBRATION .