Engine Unit: Installation
- INSTALL FLYWHEEL
- Apply adhesive to 2 or 3 threads of the bolt end.
Adhesive: Part No. 08833-00070, THREE BOND 1324 or equivalent
- Install and uniformly tighten the new 6 bolts in several passes, in the sequence shown.
Torque: 84 N.m (857 kgf.cm, 62 ft.lbf)
- Retighten the flywheel bolts by 90° in the numerical order shown.
- Apply adhesive to 2 or 3 threads of the bolt end.
- INSTALL DAMPER DISC
- Insert SST in the damper disc, then insert them in the flywheel.
SST 09301-00110
HINT:
Take care not to insert damper disc in the wrong direction.
- Set the damper spring on the damper disc.
- Following the procedures shown in the illustration, tighten the 6 bolts in the order starting the bolt locating near the knock pin on the top.
Torque: 16 N.m (163 kgf.cm, 12 ft.lbf)
HINT:
- Following the order in the illustration, tighten the bolts at a time evenly.
- Move SST up and down, right and left lightly, after checking that the disc in the center, tighten the bolts.
- Insert SST in the damper disc, then insert them in the flywheel.
- INSTALL TRANSAXLE TO ENGINE
- Attach the transaxle to the engine, and install the 6 bolts.
Torque: 33 N.m (337 kgf.cm, 24 ft.lbf)
- Install the dust cover.
- Install the LH engine mounting bracket.
Torque: 52 N.m (530 kgf.cm, 38 ft.lbf)
- Attach the transaxle to the engine, and install the 6 bolts.
- SET ENGINE JACK NOTE: Using a chain, hold the engine tightly.
- INSTALL ENGINE AND TRANSAXLE ASSEMBLY IN VEHICLE
- Raise the engine into the engine compartment.
- Keep the engine level, and align RH and LH mountings with the insulator.
- Connect the LH mounting bracket to the insulator with the nut.
Torque: 80 N.m (816 kgf.cm, 59 ft.lbf)
- Connect the RH mounting bracket to the insulator with the 2 bolts and 2 nuts.
Torque: 52 N.m (530 kgf.cm, 38 ft.lbf)
- INSTALL SUSPENSION MEMBER
Connect the suspension member with the 4 bolts.
Torque:
Bolt A: 113 N.m (1,152 kgf.cm, 83 ft.lbf)
Bolt B: 157 N.m (1,601 kgf.cm, 116 ft.lbf)
- INSTALL TORQUE ROD
- Install the torque rod through bolt and nut.
Torque: 100 N.m (1,020 kgf.cm, 74 ft.lbf)
- Install the 2 bolts.
Torque: 60 N.m (612 kgf.cm, 44 ft.lbf)
- Install the torque rod through bolt and nut.
- INSTALL DRIVE SHAFTS (See INSTALLATION )
- CONNECT BALL JOINT TO LOWER ARM
Torque: 142 N.m (1,448 kgf.cm, 105 ft.lbf)
- CONNECT STABILIZER BAR LINK
Torque: 74 N.m (755 kgf.cm, 55 ft.lbf)
- CONNECT TIE ROD END TO STEERING KNUCKLE (See FRONT AXLE HUB & WHEEL BEARING )
- INSTALL EXHAUST PIPE
- Install the 2 gaskets to the exhaust pipe and connect the 2 O-rings.
- Install the 2 springs and 3 bolts.
Torque:
Front exhaust pipe: 62 N.m (630 kgf.cm, 46 ft.lbf)
Tailpipe: 32 N.m (326 kgf.cm, 24 ft.lbf)
- Connect the hose to the actuator.
- Connect the heated oxygen sensor.
- INSTALL A/C COMPRESSER
- Connect the A/C compresser to the engine with the 4 bolts.
Torque: 25 N.m (255 kgf.cm, 18 ft.lbf)
- Connect the A/C compresser connector.
- Connect the A/C compresser to the engine with the 4 bolts.
- CONNECT INTERMEDIATE EXTENSION STEERING ASSEMBLY (See COMPONENTS )
- INSTALL DRIVE BELT (See DRIVE BELT ROUTING )
- CONNECT FUEL TUBE
- INSTALL J/B NO. 1 TO RH FENDER APRON
- CONNECT ENGINE WIRE TO CABIN
- Pull in the engine wire to the cowl panel and connect the grommet.
- Connect the ECM connectors.
- Install the ECM (See ENGINE CONTROL MODULE ).
- INSTALL BRAKE RESERVOIR TANK
- Install the reservoir tank with the 2 bolts.
- Connect the brake fluid level sensor connector.
- CONNECT SHIFT LEVER CABLE TO TRANSAXLE
- CONNECT HEATER HOSE TO CYLINDER BLOCK
- CONNECT 2 RADIATOR HOSES TO RADIATOR
- INSTALL ENGINE COOLANT RESERVOIR TANK
- INSTALL AIR INLET
- CONNECT CONNECTORS, CLAMPS AND HOSES
- Connect the Ground strap from LH fender apron.
- Connect the Ground strap from RH fender apron.
- Connect the VSV hose for purge line.
- Connect the VSV connector for purge line.
- Connect the 2 power steering connectors.
- Connect the Heated oxygen sensor connector.
- Connect the Engine wire clamps.
- INSTALL AIR CLEANER ASSEMBLY
- Install the air cleaner assembly with the 2 bolts.
- Tighten the 2 hose clamps.
- Connect the EVAP hose to the air cleaner case.
- Connect the MAF meter connector.
- INSTALL HEATER UNIT WATER PUMP (See HEATER WATER PUMP )
- INSTALL CONVERTER AND INVERTER ASSEMBLY (See CONVERTER AND INVERTER ASSEMBLY )
- INSTALL OUTER FR COWL TOP PANEL ASSEMBLY (See INSTALLATION )
- FILL WITH ENGINE COOLANT
- FILL WITH HV COOLANT
- INSTALL ENGINE UNDER COVERS
- CONNECT BATTERY NEGATIVE (-) TERMINAL AND HV BATTERY SERVICE PLUG (See SERVICE PRECAUTIONS )
- ROAD TEST VEHICLE
Check for abnormal noise, shock slippage, correct shift points and smooth operation.
- RECHECK ENGINE COOLANT AND HV TRANSAXLE COOLANT