Ignition Timing: Inspection
- WARM UP ENGINE
Allow the engine to warm up to normal operating temperature.
- CHECK IDLE SPEED (See page INSPECTION )
- CONNECT TIMING LIGHT
Connect the tester probe of a timing light to the black-white service wire of the engine wire as shown in the illustration.
- INSPECT IGNITION TIMING
- Using SST, connect terminals to TC and CG of the DLC3.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
SST 09843-18040
NOTE: After engine RPM is kept at 900 - 1,500 RPM for 5 seconds, check that it returns to idle speed. - Using a timing light, check the ignition timing.
Ignition timing: 8 - 12° BTDC @ idle
- Remove the SST from the DLC3.
- Using SST, connect terminals to TC and CG of the DLC3.
- FURTHER CHECK IGNITION TIMING
Ignition timing: 5 - 15° BTDC @ idle
HINT:
The timing mark moves in a range between 5° and 15°.
- DISCONNECT TIMING LIGHT