LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2005 >> Land Cruiser >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> SFI System >> Injector >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

SFI System: Injector: Installation

  1. INSTALL INJECTORS AND DELIVERY PIPES 
    NOTE:
    • Be careful not to drop the injectors when installing the delivery pipes.
    • Since the O-ring may be stuck to the injector, do not put a side load on it at the removal.
    1. Install a new grommet to each injector.
      Fig 1: Installing Grommet To Each Injector
      G03076890Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Apply a light coat of gasoline to new O-rings and install them to each injector.
    3. While turning the injector clockwise and counterclockwise, push it to the delivery pipes. Install the 8 injectors.
      Fig 2: Pushing Injector To Delivery Pipes
      G03076891Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Position injector connector outward.
    5. Place the 4 spacers and 8 new insulators on the intake manifold.
    6. Place the 2 delivery pipes and the injectors assemblies on the lower intake manifold.
    7. Temporarily install the 4 nuts.
    8. Install the front fuel pipe with the bolt, the 4 new gaskets and the 2 union bolts.

      Torque: 

      • 39 N.m (400 kgf.cm, 29 ft.lbf) for union bolts 
      • 7.5 N.m (80 kgf.cm, 66 in.lbf) for bolt 
    9. Install the bolt holding the clamp on the fuel return pipe to the LH delivery pipe.

      Torque: 7.5 N.m (80 kgf.cm, 66 in.lbf) 

      Fig 3: Installing Bolt Holding Clamp On Fuel Return Pipe
      G03076892Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    10. Check that the injectors rotate smoothly.

      HINT:

      If injectors do not rotate smoothly, the probable cause is incorrect installation of O-rings. Replace the O-rings in that case.

      Fig 4: Checking Injectors Rotate Smoothly
      G03076893Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    11. Position the injector connector outward.
    12. Tighten the 4 nuts holding the delivery pipes to the lower intake manifold.

      Torque: 21 N.m (214 kgf.cm, 15 ft.lbf) 

    13. Connect the 8 injectors connectors.
  2. INSTALL ENGINE WIRE TO LH DELIVERY PIPE 

    Install the 2 wire clamps on the engine wire to the brackets on the delivery pipe.

    Fig 5: Installing Wire Clamps On Engine To Brackets
    G03076894Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL ENGINE WIRE PROTECTOR 
    1. Connect the engine wire clamp to the No. 1 engine hanger.
    2. Install the engine wire protector with the 2 bolts.
    3. Connect the PCV hose to the PCV valve.
    4. Connect VSV EVAP to the upper intake manifold.
    5. Install the No. 1 V-bank cover bracket to the upper intake manifold.
    6. Install the No. 2 V-bank cover bracket to the upper intake manifold.
    7. Install the No. 3 V-bank cover bracket to the upper intake manifold.
    8. Install the No. 4 V-bank cover bracket to the upper intake manifold.
  4. INSTALL FUEL PRESSURE PULSATION DAMPER (See  SFI SYSTEM   ) 
  5. INSTALL INTAKE AIR CONNECTOR 
  6. INSTALL V-BANK COVER