LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2006 >> Sienna CE >> Repair and Diagnosis >> Engine Performance >> Engine Control System (3MZ-FE) >> Throttle Body >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Throttle Body: Installation

  1. INSTALL THROTTLE BODY ASSEMBLY 
    1. Install a new gasket to the intake air connector.
    2. Install the throttle body with the 2 bolts and the 2 nuts.

      Torque: 11 N*m (112 kgf*cm, 8 ft.*lbf) 

    3. Connect the No. 3 water by-pass hose.
    4. Connect the No. 2 water by-pass hose.
    5. Connect the throttle motor connector.
  2. INSTALL AIR CLEANER CAP SUB-ASSEMBLY 

    Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf) 

  3. ADD ENGINE COOLANT (See  REPLACEMENT  ) 
  4. CHECK FOR ENGINE COOLANT LEAKAGE 

    (See ON-VEHICLE INSPECTION )

  5. INSTALL V-BANK COVER SUB-ASSEMBLY 
    1. Fit the 2 retainers and install the V-bank cover.
    2. Using a socket hexagon wrench 5, tighten the 3 nuts.

      Torque: 7.9 N*m (81 kgf*cm, 70 in.*lbf)