Knock Sensor: Installation
- INSTALL KNOCK CONTROL SENSOR
- Install the 2 knock sensors with the 2 nuts, as shown in the illustration.
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
- Connect the 2 knock sensor connectors.
- Install the 2 knock sensors with the 2 nuts, as shown in the illustration.
- INSTALL AIR PUMP ASSEMBLY (See INSTALLATION )
- INSTALL INTAKE MANIFOLD ASSEMBLY (See LUBRICATION )
- CONNECT FUEL MAIN HOSE (See INSTALLATION )
- CONNECT FUEL RETURN HOSE (See INSTALLATION )
- INSTALL INTAKE AIR CONNECTOR PIPE (see INSTALLATION )
- INSTALL V-BANK COVER SUB-ASSEMBLY (see INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- ADD ENGINE COOLANT (See REPLACEMENT )
- CHECK FOR ENGINE COOLANT LEAKS
- Check for engine coolant leaks (see REPLACEMENT ).
- CHECK FOR FUEL LEAKS
- Check for fuel leaks (see ON-VEHICLE INSPECTION ).