Throttle Body: Installation
- INSTALL THROTTLE BODY ASSEMBLY
- Install a new gasket onto the intake manifold.
- Install the throttle body with the 2 bolts and 2 nuts.
Torque: 9.0 N*m (90 kgf*cm, 80 in.*lbf)
- Connect the water bypass hose No. 2 [C] to the throttle body.
- Connect the water by pass hose [D] to the throttle body.
- Connect the throttle control motor connector.
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY
- Install the air cleaner cap together with the air cleaner hose.
- Tighten the hose clamp bolt, then connect the air cleaner hose.
Torque: 2.0 N*m (20 kgf*cm, 18 in.*lbf)
- Connect the ventilation hose No. 1 to the cylinder head cover.
- Connect the fuel vapor feed hose No. 3 [D] to the VSV.
- Connect the fuel vapor feed hose No. 1 [E] to the VSV.
- Install the 2 wire harness clamps [F].
- Connect the VSV connector [G].
- Connect the mass air flow meter connector [H].
- CONNECT BATTERY NEGATIVE TERMINAL
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- ADD ENGINE COOLANT (See COOLANT )
- CHECK ENGINE COOLANT LEAK (See COOLING SYSTEM )
- INSTALL CYLINDER HEAD COVER NO. 2
- Install the cylinder head cover No. 2 with the 2 nuts and 2 clips.
Torque: 7.0 N*m (71 kgf*cm, 62 in.*lbf)
- Install the cylinder head cover No. 2 with the 2 nuts and 2 clips.