Inspection Procedure
NOTE:
When replacing the skid control ECU, perform initialization of linear solenoid valve and calibration (see INITIALIZATION
).
- CHECK SKID CONTROL ECU (BS1, BS2 VOLTAGE)
- Measure the voltage of the connectors.
HINT:
Measure the voltage from behind the connector with the connector connected to the skid control ECU.
Standard voltage
STANDARD VOLTAGE SPECIFICATIONTester Connection Specified Condition S7-3 (BS1) - Body ground 10 to 14 V S10-7 (BS2) - Body ground 10 to 14 V
NG: REPAIR OR REPLACE HARNESS AND CONNECTOR
OK: Go to next step
- Measure the voltage of the connectors.
- PERFORM ACTIVE TEST BY TECHSTREAM (ABS WARNING LIGHT)
- Select the ACTIVE TEST, generate a control command, and then check that the ABS warning light operates.
ABS / VSC / TRAC:
ABS WARNING LIGHT SPECIFICATIONItem Test Details Diagnostic Note ABS WARN LIGHT Turns ABS warning light ON / OFF Observe combination meter OK:
The ABS warning light turns on or off.
NG: REPAIR OR REPLACE COMBINATION METER ASSEMBLY
OK: REPLACE SKID CONTROL ECU
- Select the ACTIVE TEST, generate a control command, and then check that the ABS warning light operates.