PCV Valve: Installation: Installation
- INSTALL VENTILATION VALVE SUB-ASSEMBLY
- Apply adhesive to 2 or 3 threads of the ventilation valve.
Adhesive
Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
- Install the ventilation valve.
Torque: 27 N*m (275 kgf*cm, 20 ft.*lbf)
- Connect the ventilation hose to the ventilation valve.
- Secure the ventilation hose with the clamp.
- Apply adhesive to 2 or 3 threads of the ventilation valve.
- CONNECT HEATER HOSE
- Connect the heater hose clamp.
- INSTALL V-BANK COVER . Refer to INSTALLATION - Step 11