Grind Complete
Includes: R&I Camshaft and both Manifolds (where necessary), remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats, clean Valve Guides, and adjust Valves.
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
| w/Air Cond,w/Factory Air Cond | | 8.1 | | A |
| w/Air Cond,w/o Factory Air,w/o Radiator Removal | Includes: R&I Air Conditioning Compressor; recover, evacuate and recharge Air Conditioning System. | 9.9 | | A |
| w/Air Cond,w/o Factory Air,w/Radiator Removal | Includes: R&I Air Conditioning Compressor; recover, evacuate and recharge Air Conditioning System. | 10.2 | | A |
| w/o Air Cond | | 6.7 | | A |
| Combination Procedure: VALVE GUIDE: Remove & Replace: |
| All | | 0.6 | | A |
| One | | 0.3 | | A |