Work sequence
NOTE:
- An assistant is required to help in aligning the exhaust system.
- Align the exhaust system when it is cold.
- Pre-tension the exhaust system forward with the locally manufactured tool.
- Loosen bolts on double clamps, - -.
- Slide exhaust system forward until locally manufactured tool can be inserted through rearmost hole in tunnel bridge - arrow -. Flattened side of locally manufactured tool faces toward exhaust system hanger pins.
- Position new double clamp, as illustrated, approx. 5 mm distance from markings - A - and tighten. Torque setting 40 Nm
NOTE:
- Mark - A - is valid for models with either a manual or an automatic transmission.