LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Scion >> 2009 >> tC L4-2.4L (2AZ-FE) >> Repair and Diagnosis >> Starting and Charging >> Charging System >> Alternator >> Service and Repair >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation









2AZ-FE CHARGING: GENERATOR: INSTALLATION

2AZ-FE CHARGING: GENERATOR: INSTALLATION

1. INSTALL GENERATOR ASSEMBLY





(a) Install the wire harness clamp bracket with the bolt.
Torque: 8.4 Nm (85 kgf-cm, 74 in-lbf)





(b) Confirm that the wire harness of the crankshaft position sensor is secured to the wire harness clamp bracket through the back of the rib of the timing chain cover.





(c) Install the generator with the 2 bolts.
Torque: 21 Nm (215 kgf-cm, 16 ft-lbf)
Torque: 52 Nm (530 kgf-cm, 38 ft-lbf)





(d) Install the 2 wire harness clamps.
(e) Connect the generator wire with the nut.
Torque: 9.8 Nm (100 kgf-cm, 7 ft-lbf)
(f) Install the terminal cap.
(g) Connect the generator connector.
2. INSTALL FAN AND GENERATOR V BELT Installation





3. INSTALL FRONT FENDER APRON SEAL RH
(a) Install the apron seal with the 3 clips and 2 screws.
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
5. PERFORM INITIALIZATION
(a) Perform initialization Testing and Inspection.
NOTICE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.