Drive Plate With Overload Protection, Checking Run-Out And Adjusting: Notes
-- Remove The A/C Compressor. Refer To A/C COMPRESSOR, REMOVING AND INSTALLING .
-- Clean The Drive Plate Flange -A-.
-- Secure A Dial Gauge -B- Using A Dial Gauge Holder -C- (For Example Using Dial Gauge Holder:VW387 ) On A/C Compressor.
-- Set Probe Of Dial Gauge -D- On Flange Of Drive Plate -A- With A Pre-Tension Of Approximately 1.0 mm.
-- Turn The A/C Compressor Drive Unit -E- A Few Turns.