86 10... Installation position of BMW lettering
Top edge of lettering at same height as recess for position light (1).
Distance between drawbar member and lettering (2) is 300 mm.
Installation:
Remove grease from gluing surfaces.
Top edge of lettering at same height as recess for position light (1).
Distance between drawbar member and lettering (2) is 300 mm.
Installation:
Remove grease from gluing surfaces.