61 14 005 Removing and installing/replacing distribution box (front)
Special tools required:
WARNING:
Observe SAFETY INFORMATION
for handling vehicle battery.
Necessary preliminary tasks:
- Clamp off Battery Lead From Negative Connection Point . See 61 20 900 DISCONNECTING AND CONNECTING BATTERY EARTH LEAD or 61 20 900 DISCONNECTING AND CONNECTING BATTERY NEGATIVE LEAD .
NOTE:
Work shown on the F20 by way of example, deviations in detail are possible in other models.
Turn locks (1) 90° counterclockwise.
Unlock catch (3).
Remove cover (2).
Release latch mechanisms (1) and remove lid (2).
Installation note:
Make sure cover (2) is correctly locked.
Installation note:
Latch mechanisms (1) and gasket (2) on lid (3) must not be damaged or missing.
Make sure gasket (2) is correctly seated in lid (3).
Release power distribution box (1) with special tool 00 9 325 from lower section (2) and pull power distribution box (1) upward.
Release and disconnect all plug connections in area (1).
Remove power distribution box (2).
Installation note:
Make sure all plug connections are correctly locked.