Install the control unit for the power tailgate (HKL).
- Correctly position the control unit (3) and engage it into the detent (2)
- Connect connectors (1)
and lock
Follow-up work
- Refer to INSTALLING LUGGAGE COMPARTMENT WHEEL ARCH TRIM PANEL ON RIGHT .
- Refer to INSTALLING LOADING EDGE TRIM .
- Refer to RECONNECTING ALL BATTERY GROUND LEADS .
- Refer to ENCODING/PROGRAMING CONTROL UNIT(S) .
- Refer to ACTIVATING THE 48 V ELECTRICAL SYSTEM .