LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Buick >> 2013 >> Verano Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 88 (Battery, Charging System And Starting System) >> Diagnostic Information and Procedures >> DTC P0562 >> Circuit/System Testing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit/System Testing

WARNING: This page is about a different car, the 2010 Pontiac G5 and 2010 Chevrolet Cobalt. However, it is still accessible from the selected car via links, so may be relevant.
  1. Engine running, accessories OFF, measure and record the battery voltage at the battery terminals. The voltage should be between 12.6 and 15.0 V.
  2. Ignition OFF, disconnect the harness connectors at the ECM.
  3. Ignition OFF and scan tool disconnected, open and close the driver door, and wait 1 minute. Test for less than 5 Ω between the ground circuit terminals listed below and ground.
    • Terminal 1 X2 (LNF)
    • Terminal 2 X2 (LNF)
    • Terminal 4 X2 (LNF)
    • Terminal 73 X2 (L61/LE5)
    • If greater than the specified range, test the ground circuit for an open/high resistance.
  4. Verify that a test lamp illuminates between the B+ circuit terminals listed below and ground.
    • Terminal 56 X2 (LNF)
    • Terminal 20 X1 (L61/LE5)
    • If the test lamp does not illuminate, test the B+ circuit for a short to ground or an open/high resistance.
  5. If all circuits test normal, replace the ECM.