Installation Procedure
- Install fuse block with integrated positive battery cable and lock the retaining tabs.
- Install body wiring harness and body wiring harness nuts and tighten to 2.5 N.m (22 lb in).
- Install front compartment fuse block cable nut and tighten to 12 N.m (106 lb in).
- Install the starter generator cable and starter generator cable nut and tighten to 12 N.m (106 lb in).
- Install the 2 fuse block mounting panel nuts and tighten to 12 N.m (106 lb in).
- Install the positive battery cable to the battery and tighten to 4.5Y (40 lb in).
- Close the battery fuse box cover and lock the retaining tabs (1, 4).
- Connect battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .
CAUTION:
Refer to Fastener Caution .
NOTE:
Due to various option content there might be 2 or 4 body wiring harness nuts installed.