Removal Procedure
- Disconnect the negative battery cable. Battery Negative Cable Disconnection and Connection
Air Cleaner Assembly (1) - Remove - Air Cleaner Assembly Replacement (LCV)
Fuel Feed Pipe (1) - Remove - Fuel Feed Pipe Replacement (Engine LCV)
Evaporative Emission Canister Purge Tube (1) - Reposition - Evaporative Emission Canister Purge Tube Replacement (LCV)
Evaporative Emission Canister Purge Solenoid Valve Hose (1) - Reposition - Evaporative Emission Canister Purge Solenoid Valve Hose Replacement (LCV)
Intake Manifold (3) - Reposition away - Intake Manifold Replacement (LCV)
-
Drive Belt (1) - Remove - Drive Belt Replacement (LCV)
- Raise and support the vehicle. Lifting and Jacking the Vehicle
Battery Positive Cable Nut (1) - Remove
- Battery Positive Cable (2) - Remove
- Electrical Connector (4) - Disconnect
- Lower the vehicle.
Generator Bolt (1) - Remove [2x]
- Generator Nut (2) - Remove
- Remove generator mounting stud, if necessary. (3)
- Remove the generator. (4)