Circuit/System Testing
- Ignition OFF, disconnect the harness connector at the A23D Door Latch Assembly-Driver. It may take up to 2 minutes for all vehicle systems to power down.
- Test for less than 10 Ω between the ground circuit terminal 8 and ground.
- Ignition OFF.
- Test for less than 2 Ω in the ground circuit end to end.
- If 2 Ω or greater, repair the open/high resistance in the circuit.
- If less than 2 Ω, repair the open/high resistance in the ground connection.
- Ignition ON.
- Test for greater than 10 V between the signal circuit terminal 4 and ground.
- Ignition OFF, disconnect the harness connector at the S79D Window Switch-Driver.
- Test for infinite resistance between the signal circuit and ground.
- If less than infinite resistance, repair the short to ground on the circuit.
- Test for less than 2 Ω in the control circuit end to end.
- If 2 Ω or greater, repair the open/high resistance on the circuit.
- If less than 2 Ω, replace the S79D Window Switch-Driver.
- Test or replace the A23D Door Latch Assembly-Driver.