September 30: LEMON manuals is back up on a temporary server! Slowness is possible
TWC Test Enabled
Range Yes/No The display shows Yes or No. This display indicates the Idle Catalyst Test (P0420) has started to run. There is a 5 second delay between the TWC Test Initilization Conditions Met and the idle catalyst test being enabled