October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Solenoid Pull-In & Hold-In Resistance Test
- Using an ohmmeter, measure resistance between solenoid terminal "S" and terminal "M". If resistance is 5.0 ohms or less, pull-in coil is open. Replace solenoid.
- Using an ohmmeter, measure resistance between solenoid terminal "S" and solenoid housing. If resistance is 5.0 ohms or less, hold-in coil is open. Replace solenoid.