Installation Procedure
- Coat the threads of the ECT sensor with sealer.
- Install the ECT sensor.
Tighten: Tighten the ECT sensor to 17 N.m (13 lb ft) .
- Connect the ECT connector.
- Install the VIS vacuum tank. Refer to Intake Manifold Tuning (IMT) Valve Vacuum Reservoir Replacement .
Tighten: Tighten the VIS vacuum tank retaining bolts to 8 N.m (71 lb in) .
- Connect the negative battery cable.
- Fill the coolant system.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.