Installation Procedure
- Install the EBTCM assembly to the bracket.
- CAUTION:
Refer to Fastener Caution .
Install the EBTCM assembly bracket bolt (1) and tighten to 10 N.m (89 lb in).
- Install the EBTCM assembly.
Install the EBTCM assembly bracket nuts (1) and tighten to 22 N.m (16 lb ft).
Install the right front brake pipe fitting (1) and tighten to 18 N.m (13 lb ft).
- Install the left rear brake pipe fitting (2) and tighten to 18 N.m (13 lb ft).
Install the right rear brake pipe fitting (1) and tighten to 18 N.m (13 lb ft).
- Install the left front brake pipe fitting (2) and tighten to 18 N.m (13 lb ft).
Install the master cylinder secondary brake pipe fitting (1) and tighten to 25 N.m (18 lb ft).
- Install the master cylinder primary brake pipe fitting (2) and tighten to 25 N.m (18 lb ft).
- Connect the EBCM electrical connector.
- Connect the brake fluid level sensor electrical connector.
- Install the radiator surge tank. Refer to Radiator Surge Tank Replacement (LFX) .
- Install the battery tray. Refer to Battery Tray Replacement .
- Program the EBCM. Refer to Control Module References .
- Bleed the antilock brake system. Refer to Antilock Brake System Automated Bleed .
- Perform the Diagnostic System Check - Vehicle .
- Calibrate the brake pedal position sensor. Refer to Brake Pedal Position Sensor Calibration .
- Center the steering angle sensor. Refer to Steering Wheel Angle Sensor Centering .