Powertrain Control Module: Installation
- Install the PCM.
- Install the 3 mounting screws (Fig 1).
- Tighten screws.
NOTE:
The PCM connectors are color coded.
- Install and lock the 4 electrical connectors (Figure).
- Install the left front splash shield.
- Install the left front wheel.
- Lower vehicle.
Courtesy of DAIMLERCHRYSLER CORP.
- Connect the negative battery cable.