October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Installation
INSTALLATION
1.Press the Front Control Module (FCM) onto the Integrated Power Module (IPM).
2.Install the mounting fasteners.
3.Install the IPM.
4.Connect the positive and negative battery cables.