LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2009 >> Sebring Base, 2D Convertible, EDG >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery System >> Standard Procedure >> Battery Reconnection >> Notes
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Battery Reconnection: Notes

NOTE: This reconnection procedure is to be performed anytime the battery has been disconnected.
  1. Connect the negative battery cable remote terminal to the remote battery post and tighten the nut.
    CAUTION: Once the battery has been connected, review and perform the following information as applicable.