Verification Procedure VER-2
Inspect vehicle to ensure all engine components are connected. Reassemble and reconnect components as necessary. If another fault was read previously and not corrected, return to TEST FC-1A and follow path specified by other fault. If Powertrain Control Module (PCM) has not been replaced, perform the following:
- Connect DRB-II to data link connector, and erase faults. Disconnect DRB-II.
- Using DRB-II, reset all values in adaptive memory.
- Disconnect DRB-II.
To ensure no other fault remains, perform following:
- If vehicle is equipped with A/C, turn A/C and blower motor on. Drive vehicle for at least 5 minutes and attain a speed of at least 40 MPH. Ensure transmission shifts through all gears.
- Upon completion of road test, turn engine off. Restart engine, and let idle for at least 2 minutes. Turn engine off. Connect DRB-II to data link connector.
- Read all fault messages. If repaired fault has reset, repair is not complete. Check all pertinent TECH SERVICE BULLETINS (TSBs), and return to TEST FC-1A, if necessary. If another fault exists, return to TEST FC-1A and follow path specified by other fault. If no other faults exist, repair is now complete.