October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Ground Circuit Continuity Check
- Insert a small straight pin in control module Black wire. Connect negative voltmeter lead to distributor base and positive lead to straight pin in black wire. Measure resistance and remove straight pin from wire.
- If voltage reading was greater than .5 volt, proceed to Distributor Ground Circuit Continuity Check. If voltage was .5 volt or less, replace control module.