Normal Operation
Under normal operation, when blower operation is requested a signal is sent from the control module to the Smart Junction Box (SJB) through circuit 1398 (PK/WH) (Single-zone EMTC only) or over the SCP BUS (Dual-zone EMTC only). The SJB sends a message over the SCP bus to the PCM.
The blower motor relay coil receives ignition voltage through circuit 298 (VT/OG). The coil receives ground from the Smart Junction Box (SJB) through circuit 1322 (BN/WH) if any position but OFF is selected. Voltage is supplied to the relay switch contact through circuit 364 (BK/LG). When the relay coil is energized, voltage is delivered to the blower motor through circuit 371 (PK/WH). Ground for the blower motor is provided through circuit 261 (OG/BK) from the blower resistor or the blower switch (HI). The blower resistor and blower switch is grounded through circuit 1205 (BK).