Pull-In Windings Test
Connect test equipment as in hold-in windings test. See HOLD-IN WINDINGS TEST above. See Fig 1. Ground starter solenoid terminal "M". Turn switch on and quickly adjust carbon pile load until voltage reads as specified. See PULL-IN WINDINGS SPECIFICATIONS table. Check ammeter reading. Turn off carbon pile and open switch. Refer to the PULL-IN WINDINGS SPECIFICATIONS table. If ammeter reading is not as specified, replace starter solenoid.