LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> GMC >> 2009 >> Canyon 4D Pickup, 2.9 9 >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System & Fuel System - 2.9L - Introduction, Service & Repair >> Repair Instructions >> Knock Sensor Replacement >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

    Fig 1: View Of KS Engine Wiring Harness Connector
    GM1352023Courtesy of GENERAL MOTORS CORP.
    CAUTION: Refer to Fastener Caution .
  1. Install the KS (1) and the retaining bolt to the engine block, positioning the electrical terminals rearward.

    Tighten:  Tighten the KS bolt to 25 N.m (18 lb ft).

  2. Connect the engine wiring harness electrical connector (3) to the KS (1).
  3. Install the left wheelhouse liner. Refer to Front Wheelhouse Liner Replacement .
  4. Lower the vehicle.