LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Genesis >> 2017 >> G80 3.8, AWD >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System Diagnosis (3 Of 3) - 3.8L >> DTC P0685: ECM/PCM Power Relay Control Circuit Open >> Wiring Inspection >> Control Circuit Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Control Circuit Inspection

■ Check short in harness 

  1. IG "OFF". Disconnect the metal core box and ECM (PCM) connector.
  2. Measure the resistance between main relay control terminal of metal core box harness connector and chassis ground.

    Specification:  Infinite

  3. Is the measured resistance within specification?

    YES 

    • Go to "Check open in harness" procedure.

    NO 

■ Check open in harness 

  1. IG "OFF". Disconnect the metal core box and ECM (PCM) connector.
  2. Measure the resistance between main relay control terminal of metal core box harness connector and main relay control terminal of ECM (PCM) harness connector.

    Specification:  Approx. below 1Ω

  3. Is the measured resistance within specification?

    YES 

    • Substitute with a known - good metal core box and check for proper operation. If the problem is corrected, replace metal core box and go to "VERIFICATION OF VEHICLE REPAIR " procedure.

    NO