October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Power Window Switch: Testing and Inspection
1.Remove the switch from the door trim panel. 2.Check for continuity between the terminals. If continuity is not as specified in the table, replace the power window switch.