Harness Inspection Procedures

  1. Measure the Power supply voltage.
    • Injector Connector: Disconnected
    • ECM Connector: Connected
    • Ignition Switch: ON
    • Voltage (V): Battery Voltage
    Fig 1: Measuring Power Supply Voltage
    G04932137Courtesy of HYUNDAI MOTOR CO.

    OK  : Go to step  2

    NG  : Repair the harness

  2. Check for an open circuit or a short circuit between ECM and Injector.
    • Injector Connector: Disconnected
    • ECM Connector: Disconnected
    Fig 2: Checking Resistance Between ECM And Injector
    G04932138Courtesy of HYUNDAI MOTOR CO.

    OK  : END

    NG  : Repair the harness