Control Circuit Inspection
- Ignition "OFF"
- Disconnect OCV (intake) connector.
- Ignition "ON" & Engine "OFF"
- Measure voltage between control terminal of the OCV (intake) harness connector and chassis ground.
Specification: Approx. 2~3V
- Is voltage within specification?
YES
- Go to "Component Inspection " as follows
NO
- Repair short to battery in control circuit and go to "Verification of Vehicle Repair " procedure.