Repair Procedures: Installation
- Install the retainer (A) and then tighten the nut (B).
Tightening torque:
11.8 - 14.7 N.m (1.2 - 1.5 kgf.m, 8.7 - 10.8 lb-ft)
- Install the heater and blower.
(Refer to Heating, Ventilation and Air Conditioning - "HEATER UNIT ")
- Install the crash pad.
(Refer to Body (Interior and Exterior) - "CRASH PAD ")
- Install the shift cable (B) and then fix the snap pin (A).CAUTION:
- Remove the floor console assembly.
(Refer to Body (Interior and Exterior) - "FLOOR CONSOLE ")
- Install the shift lever knob & boots (A).
- Push the shift cable (B) slightly in the direction of the arrow to remove the clearance, and then tighten the nut (A) to the specified torque.
Tightening torque:
9.8 - 13.7 N.m (1.0 - 1.4 kgf.m, 6.5 - 10.1 lb-ft)
CAUTION:- Replace the cable clip, use a new one.
- Install the battery and tray.
(Refer to Engine Electrical System - "BATTERY ")
- Install the ECM.
(Refer to Engine Control System - ("REPAIR PROCEDURES ").
- Install the air cleaner assembly and air duct.
(Refer to Engine Mechanical System - "AIR CLEANER ")
CAUTION:- Check that operating surely at each range of the inhibitor switch corresponding to each position of shift lever.