LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Infiniti >> 2009 >> M45 Base >> Repair and Diagnosis (Single Page) >> Accessories & Equipment >> Entertainment Systems >> Audio, Visual & Navigation System >> Without Mobile Entertainment System >> Component Diagnosis >> VP Signal Circuit (Front Display Unit To Av Control Unit) >> Without Navigation >> WITHOUT NAVIGATION : Diagnosis Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

WITHOUT NAVIGATION : Diagnosis Procedure

  1. CHECK CONTINUITY VERTICAL SYNCHRONIZING (VP) SIGNAL CIRCUIT
    1. Turn ignition switch OFF.
    2. Disconnect front display unit connector and AV control unit connector.
    3. Check continuity between front display unit harness connector terminal 20 and AV control unit harness connector terminal 57.

      20 - 57 : Continuity should exist  .

    4. Check continuity between front display unit harness connector terminal 20 and ground.

    20 - Ground : Continuity should not exist  .

    Is the inspection result normal? 

    YES: GO TO 2.

    NO: Repair harness or connector.

  2. CHECK VERTICAL SYNCHRONIZING (VP) SIGNAL
    1. Connect front display unit connector and AV control unit connector.
    2. Turn ignition switch ON.
    3. Check signal between front display unit harness connector terminal 20 and ground.
    FRONT DISPLAY UNIT HARNESS CONNECTOR REFERENCE

    20 - Ground
    G04923331Courtesy of NISSAN MOTOR CO., U.S.A.

    Is the inspection result normal? 

    YES: Replace AV control unit.

    NO: Replace front display unit.