October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Grind Complete
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).
| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
| V6,3.2L Eng,O.H.C.- SOHC,Gas, 24 Valve Eng | | 13.9 | | A |
| Additional Procedure: VALVE: Grind Complete: |
| 3.2L Eng, Where Pwr Strg interferes add | | 0.5 | | A |