Main Control Valve Body: Installation
WARNING: This page is about a different car, the 2003 Jaguar XJR, 2002 Jaguar XJR, and 2001 Jaguar XJR. However, it is still accessible from the selected car via links, so may be relevant.
- Installation is the reverse of the removal procedure, noting the following steps.
- Clean all mating faces and relevant parts.
- Tighten the nine bolts securing the valve body, to the specified torque figure. See Figure.
- Refit the dowel (leaf spring to valve body) and the leaf spring. Fit and tighten the securing bolt to the specified torque figure. See Figure and Figure .
- Tighten the center retaining bolt of the electrical connector to the specified torque figure. See Figure.
- Refill transmission. Refer to TRANSMISSION FLUID FILLING .
- Check for leaks and remove spilt fluid.