LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2004 >> Liberty Limited, 4WD, Part Time >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery System >> Battery Tray >> Installation
October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.

Battery Tray: Installation

  1. Clean and inspect the battery tray. See CLEANING  .
  2. Position the battery tray onto the weld studs on the front extension of the left front wheelhouse inner panel.
  3. Install the battery temperature sensor onto the battery tray. See GENERATORS & REGULATORS article.
  4. Install and tighten the three nuts that secure the battery tray to the weld studs on the front extension of the left front wheelhouse inner panel. Tighten the nuts to 7 N.m (65 in. lbs.).
  5. Install the PDC on the battery tray.
  6. Install the battery onto the battery tray. See BATTERY  .