Charging System (Service Information): Generator: Installation: 3.6L
- Install the generator into the vehicle.
- Install the three mounting retainers.
Tighten to 25 N.m (18 Ft. Lbs.).
- Install ground wire on mounting stud (4).
- Install the lower front generator mounting retainer (5).
Tighten to 23 N.m (17 Ft. Lbs)
- Install the serpentine belt. Refer to BELT, SERPENTINE, INSTALLATION .
- Install the B+ terminal to the generator stud.
Tighten to 11 N.m (97 In. Lbs.).
- Plug in the field circuit to the generator.
- Connect the negative battery cable.