LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2019 >> Grand Cherokee Trackhawk >> Repair and Diagnosis >> External Pages >> Different car >> Section 5 (Electronic Control Modules (Service Information)) >> Module, Power Liftgate Control (PLGM) >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Module, Power Liftgate Control (PLGM): Installation

WARNING: This page is about a different car, the 2018 Jeep Grand Cherokee. However, it is still accessible from the selected car via links, so may be relevant.
GC0145737Courtesy of CHRYSLER GROUP, LLC
  1. Position the Power LiftGate Module (PLGM) (2) to the left lower inner D-pillar (1) in the vehicle.
  2. Engage the two tabs integral to the lower end of the PLGM housing into the slots in the lower left inner D-pillar.
  3. Press the top of the PLGM housing against the lower left inner D-pillar far enough for the latch feature integral to the upper end of the PLGM housing to engage the clearance hole in the inner D-pillar.
  4. Reconnect the two body wire harness (3) connectors to the PLGM connector receptacles.
  5. Reinstall the quarter trim panel to the lower left inner D-pillar. Refer to PANEL, QUARTER TRIM, INSTALLATION .
  6. Connect the battery negative cable.
  7. Using the diagnostic scan tool, navigate to the PLGM "Misc Functions" menu and perform the "Calibrate Liftgate" routine.