Charging System (Service Information): Generator: Installation: 2.4L
- Install the generator to the engine block bolts (1, 4) and tighten to the proper torque specification. Refer to TORQUE SPECIFICATIONS .
- Install the positive B+ cable to the rear of the generator stud (2) and tighten the nut to the proper torque specification. Refer to TORQUE SPECIFICATIONS .
- Connect the field generator wire harness connector (3).
- Reposition the A/C compressor to its upright installed position and tighten the inner A/C compressor mounting bolt (2) to the proper torque specification. Refer to TORQUE SPECIFICATIONS .
- Install the A/C compressor forward mounting bolts (1) and tighten to the proper torque specification. Refer to TORQUE SPECIFICATIONS .
- Install the serpentine belt. Refer to BELT, SERPENTINE, INSTALLATION .
- Install the resonator. Refer to RESONATOR, AIR CLEANER, INSTALLATION .
- Install the engine cover. Refer to COVER, ENGINE, INSTALLATION .
- Connect the negative battery cable(s). Refer to SENSOR, INTELLIGENT BATTERY (IBS), INSTALLATION .