LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Kia >> 2016 >> Cadenza Base >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System Diagnosis (3 Of 3) >> DTC P064A: Fuel Pump Control Module >> Wiring Inspection >> Ground Circuit Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Ground Circuit Inspection

■ Open in circuit check 

  1. IG "OFF"
  2. Disconnect FPCM harness connector.
  3. IG "ON"
  4. Measure the voltage between power terminal of FPCM harness connector and chassis ground. (Measurement A)
  5. Measure the voltage between power terminal and ground terminal of FPCM harness connector. (Measurement B)

    Specification:  Measurement difference between "Measurement A" and "Measurement B" is less than 200mV

  6. Is the measured voltage within specification?

    YES 

    NO