Power Circuit Inspection
- IG "OFF" and disconnect APS 2 connector.
- IG "ON".
- Measure voltage between Pin No. 2 (Power) terminal of APS 2 harness connector and chassis ground.
Specification: Approx. 5V
- Is the measured voltage within specification?
YES
- Go to "SIGNAL CIRCUIT INSPECTION " procedure.
NO
- Repair or replace as necessary and then, go to "VERIFICATION OF VEHICLE REPAIR " procedure.