Control Circuit Inspection
- IG "OFF" & Disconnect FLS connector.
- IG "ON".
- Measure voltage between Pin No. 1 (FUEL SENDER(+)) terminal of FLS harness connector and chassis ground.(A)
- Measure voltage between Pin No. 1 (FUEL SENDER(+)) terminal and Pin No. 3 (FUEL SENDER(-)) terminal of the FLS.(B)
Specification: "A" - "B" = Below 200mV
- Is the measured voltage within specification?
YES
- Go to "COMPONENT INSPECTION " procedure.
NO
- Repair or replace as necessary and then, go to "VERIFICATION OF VEHICLE REPAIR " procedue.